Including eForms completed in other events in a download package
View video
eForms completed in other events can now be included in a download package. To include an eForm completed in other events, the Include from other events check box must be checked for that eForm:
Key info
- To be included in a download package, the eForm must be complete.
- If an eForm has been completed two or more times, the most recently completed eForm is included in the download package.
- If the same eForm that is in an event with a download package is also included in another event, the status of the eForm in the event with a download package controls what happens as shown in the following table.
eForm status in event with a download package task
|
eForm status in other event
|
Result within download package
|
eForm is complete
|
Complete
|
eForm from the event with the download package task is included in the download package
|
eForm has not been started
|
Complete
|
eForm from the other event is included in the download package
|
eForm is started but not complete
|
Complete
|
eForm is not included in the download package
|
|